Above Ground Pool Installation
Above Ground Pool Installation
On a basic above ground pool installation we first cut out the grass for the area of the entire pool, plus one foot extra surrounding the perimeter. The ground is then cleared and leveled. Next, we connect the bottom track and level it using concrete blocks. Sand comes in next while other prep work is being done, such as the filter, and passing out parts. The wall is then rolled out and the liner is installed along with the other parts. By the time we leave, the pool will be filling and have about 2 inches of water. All you have to do is finish filling it, connect the ladder, and get an electrician to connect power to the motor. All installations come with a 1 year labor warranty. Product is not included. The prices below are for labor only. Call us to get prices on pools, liners, and/or other products.
Round Pools
8' Install.........$600
12' Install..........$650
15' Install..........$700
18' Install..........$750
21' Install...........$900
24' Install..........$1000
27' Install..........$1150
30' Install.........$1350
33' Install..........$1500
Oval Pools
8' x 12' Install............$850
10' x 18' Install...........$1050
12' x 17' Install............$1050
12' x 20' Install..........$1150
12' x 24' Install...........$1200
15' x 26' Install...........$1450
15' x 30' Install...........$1550
18' x 33' Install...........$1750
18' x 45' Install...........$2000
21' x 45' Install............$2100